What is the Zeng Ben lead time ?

Created by admin admin Aug 28, 2018 23:42:44 PM Published in Manufacturing Information 609 Views.

The lead time can range from 15 days to 35 days based on design requirements of the product.

Copyright 2019 ZengBen Industrial Corporation Ltd. All rights reserved.